Navus is HLF’s own platform for completions, QA/QC and handover. It holds the whole project record in one place, from the system breakdown to the final handover dossier, with document control and a full audit trail.
The system breakdown and tag register for a sample project. Illustrative data.
How Navus works
One record through the life of the project, from the system breakdown to handover and into operation.
navus / sample-project / overview
ITR_E_final_v7 (2).xlsxThree versions in circulation
Punch list: site whiteboardNot updated since Tuesday
ITR-E-0412Signature missing
Handover dossier62% · due Friday
NCR-031Status unknown
System breakdownTurnover limits set
01 · HV Distribution142 tags
01-01 · 33 kV switchboard38
=HV-SWB-001 ITR E-01 · E-02 · E-07
=HV-SWB-002 ITR E-01 · E-02
01-02 · HV cabling64
02 · Power Transformers12 tags
03 · Battery Energy Storage96 tags
06 · LV & Auxiliary Supplies311 tags
ITR E-02 · HV cable termination=HV-SWB-001
Cable identified against the schedule
Gland and shroud correct for the location
Terminated to the manufacturer’s instructions
Insulation resistance recorded
Phasing and labelling verified
Electrical supervisor ✓Client witness ✓
Completion by system
HV Distribution94%
LV Power81%
Battery Storage73%
Fire Detection66%
3Punch A open
27Punch B open
1,016ITRs signed
Handover dossier · System 01
MC certificate · HV DistributionIssued
ITR registerAll signed
As-built drawingsRev C
Punch A0 open
Ready for handover
Illustrative screens
01 / 05The problemSpreadsheets that disagree, ITRs on paper and punch lists on a whiteboard. Handover slows down because the record cannot be proved.
02 / 05StructureSystems, subsystems and tag registers set up from the contract and specifications, with every ITR mapped to the tag it proves.
03 / 05CaptureField teams complete ITRs, punch items and redlines as the work happens, with photos and sign-off attached.
04 / 05ControlProgress by system and discipline. Punch A and B items, NCRs, hold points and redlines tracked to closure.
05 / 05HandoverMechanical completion certificates and handover dossiers compiled from the record, each document traceable to its source.
Inside Navus
The screens a project team uses, from the system breakdown to the maintenance system.
The system breakdown and tag register, with every tag’s ITRs and status. Illustrative project data.
Contractor ITPs with hold points, photo evidence and release. Illustrative project data.
NCRs, first-time pass rate and the cost of poor quality. Illustrative project data.
Hazardous area register and inspection campaign. Illustrative project data.
Asset data mapped and checked before it loads into the maintenance system. Illustrative project data.
Handover dossier compiled from the record. Illustrative project data.
What it covers
Systems and tag registers
Systems and subsystems defined from the contract, with tag registers, scope boundaries and turnover limits.
ITR libraries
Inspection and test reports by discipline, mapped to systems and tags.
ITPs
Contractor and subcontractor ITPs held in the record, with hold and witness points.
Punch lists
Category A and B items raised, assigned, evidenced and closed.
NCRs and hold points
Non-conformances, hold and witness points tracked to closure.
Redlines and as-builts
Deviations captured at the workface and revision-controlled.
Document control
Drawings and documents at every revision, with approvals and an audit trail.
Certificates and dossiers
Mechanical completion and handover certificates and dossiers compiled from the record.
Ex registers and inspections
Hazardous area registers and inspection campaigns in the same platform.
Maintenance system data
Equipment data, spares, maintenance requirements and repairs handed over for the operator’s maintenance system.
Three ways to use Navus
Set-up and database buildHLF helps your team determine the system limits and subsystems, then builds the Navus database for the project.
Set-up with remote supportThe same set-up, with remote support from HLF throughout the project lifecycle.
Site completions engineersHLF provides full-time site completions engineers who manage Navus throughout the project lifecycle.
Every option includes training. Licences and permissions can be bought up front or by subscription. Each user has their own login and password, with remote support throughout the project.
Who it is for
EPC and main contractors
One controlled record across disciplines and subcontractors, ready for client review and handover.
Operators and asset owners
Hazardous area registers, inspection campaigns and maintenance data held in one place.
Specialist subcontractors
A structured completions record sized and priced for a single package.
In the field
The tag on the equipment matches the record
Each junction box, cable and item of equipment is tagged to its record in Navus, so inspections, ITRs and punch items are raised against the right asset.
On site
Records made at the equipment
Engineers open the tag on a tablet beside the panel and complete the ITR or inspection there, so the record is up to date for the whole project team.
Navus demo
A demo walks through the record, from the tag register to the handover dossier, at the scale of your project.